The Big Push

I have been very busy and I am so close to being done with the Storage Area/Broom Closet on my main floor. 

I have been pushing through and getting it done.

As I write this I have installed the floor & shelves, and primed and painted the walls.  I have installed the trim work.  I have even painted the door.

Check, check, check and check

  1.  Install pegs and finishing touches in the broom closet
  2.  Finish drywall and sanding
  3.  Install flooring
  4.  Prime and paint walls
  5.  Install shelves and trim
  6.  Paint the door
So why no after pictures today? 

I still have 2 items left. I have yet to paint the white trim work and I want to make a trip to Homegoods to make it pretty.  So tomorrow afternoon I will be posting the final look. 

Until then, here is a reminder on where I started.

And after the wall came down.
I am super excited for tomorrow.  So please make sure and stop in to see the results.

-Laurie

2 comments:

  1. hi. Where did you get the white broom holder ?

    ReplyDelete
    Replies
    1. I spray painted it. It has chipped a bit, but I wonder if you were to sray a poly over the spray paint if it would help

      Delete

Hello and Welcome. I love to hear from you.